You are here
Multimedia
Primary tabs
Type | Preview | Title | Media Description | Date | |
---|---|---|---|---|---|
![]() |
LPF - The beating heart | Next steps: Shipment to Kourou and launch in autumnWhile the LPF scientists continue... |
Aug 27, 2015 |
||
![]() |
ESA: LISA Pathfinder mission | LISA Pathfinder’s name (Laser Interferometry Space Antenna) clearly indicates the role of... |
Aug 06, 2015 |
||
![]() |
Inside LISA Pathfinder | The animation of the spacecraft build-up begins with two freely falling test masses.... |
Jul 22, 2015 |
||
![]() |
Scientific payload integrated into LISA Pathfinder | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jun 18, 2015 |
||
![]() |
LISA Pathfinder Science Mission: Final steps before launch | While the LISA Pathfinder (LPF) satellite is undergoing its last tests before shipping... |
Jun 19, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LPF scientific payload integration | While the LPF scientists continue preparing for LPF mission operations, the industrial... |
Jul 23, 2015 |
||
![]() |
LISA Pathfinder's scientific payload completely assembled | All components of the LISA Technology Package (LTP) Core Assembly have been integrated in... |
May 04, 2015 |
||
![]() |
LISA Pathfinder Orbit | LISA Pathfinder will be launched into a geostationary transfer orbit. From there, it... |
Mar 18, 2015 |
||
|
LPF assembly at Astrium UK on 27 February 2015 | At Airbus in Stevenage (UK) the LISA Pathfinder satellite science and propulsion... |
Mar 06, 2015 |
||
|
LPF assembly at Astrium UK on 27 February 2015 | At Airbus in Stevenage (UK) the LISA Pathfinder satellite science and propulsion... |
Mar 06, 2015 |
||
|
LPF assembly at Astrium UK on 27 February 2015 |
Mar 06, 2015 |
|||
|
LPF assembly at Astrium UK on 27 February 2015 | At Airbus in Stevenage (UK) the LISA Pathfinder satellite science and propulsion... |
Mar 06, 2015 |
||
![]() |
LPF assembly at Astrium UK on 27 February 2015 | At Airbus in Stevenage (UK) the LISA Pathfinder satellite science and propulsion modules... |
Mar 03, 2015 |
||
![]() |
Pre-SOVT1.13 operations test 1 | As part of a sequence of tests leading up to the formal Science Operations Verification... |
Dec 11, 2014 |
||
![]() |
Pre-SOVT1.13_operations_test_2 | As part of a sequence of tests leading up to the formal Science Operations Verification... |
Dec 11, 2014 |
||
![]() |
Pre-SOVT1.13_operations_test_3 | As part of a sequence of tests leading up to the formal Science Operations Verification... |
Dec 11, 2014 |
||
![]() |
Pre-SOVT1.13_operations_test_4 | As part of a sequence of tests leading up to the formal Science Operations Verification... |
Dec 11, 2014 |
||
![]() |
LPF - New electrode housing | CGS SpA delivered the inertial sensors of the LISA Pathfinder mission on 3rd November... |
Nov 13, 2014 |
||
![]() |
Imaging System Investigations for LISA | Gravitational wave signals measured by LISA will be superimposed by noise from various... |
Nov 06, 2014 |